Constructions Standards Checklists
CONCRETE GENERAL
FOUNDATIONS A. All form boards are properly braced or tied together, so as to maintain the design shape. B. Foundation/Slab brick ledge is poured at same
time and integrated into the foundation/slab. If applicable, brick ledge is flat, level or stepped according to the soil/grade requirements and accommodates the type of masonry to be installed. C. Concrete batch ticket is checked and is as specifed by Engineer of Record (EOR). If applicable, this can also be verifed by 3rd Party Inspection Company. D. Water added on-site is no more than 1 gallon per cubic yard. E. Concrete is discharged within 90 minutes after the introduction of water to cement. F. An adequate number of fnishers are on site to complete the slab in a timely manner. G. Concrete should be sufficiently workable for placement around reinforcement, stem walls, footers and slab penetrations. H. All concrete is consolidated using mechanical vibration to avoid visible honeycombing or exposed aggregate. I. Concrete is placed in a manner which does not result in cold joints.
CONSTRUCTION STANDARDS CHECKLISTS | Foundations | 5
Made with FlippingBook Learn more on our blog