Constructions Standards Checklists
PEX INSTALLATION
PLUMBING AND ELECTRICAL SYSTEMS A. Piping is fastened every 6' in the attics. B. Fasteners are frm but loose enough to allow piping to move. C. The PEX installation with steel studs followed the manufacturer’s recommendations. D. All horizontal runs in the floor framing are fastened every 32" o.c. E. All pipe supports are installed where piping exits wall framing. F. Nailing plates are installed to protect pipes that are run within 1 ½" of the face of a stud or joist. G. Fasteners hold the piping in position to prevent strain on the fttings when the piping is bent.
H. Vertical runs are supported at every floor level. I. Long runs of piping have an offset to allow for pipe expansion. J. PEX is kept a minimum of 12" vertical and 6" horizontal from sources of high heat or insulated with approved material, per code. K. PEX pipe is minimum 3006 series, preferably 5006 series. L. All fttings and manifolds should be made by the pipe manufacturer and installed per manufacturer installation instructions. M. Plastic sleeves are installed to protect PEX piping where it penetrates through the slab or block. N. Where fre sprinkler systems are present, CPVC sprinkler system piping is not in contact with any dissimilar materials such as metal strapping, truss plates, and wiring.
CONSTRUCTION STANDARDS CHECKLISTS | Plumbing | 15
Made with FlippingBook Learn more on our blog