Constructions Standards Checklists
BLOCK WALL – WINDOWS
DRAINAGE PLANE A. Concrete sill has been installed providing proper slope for drainage. B. Pressure treated wood has been installed as wood buck. C. The wood bucks have been back caulked including tops, bottoms, and any end grain. D. Liquid applied waterproof membrane has been installed over wood buck and block opening per code. E. Window has been installed and sealed with C920 class 25 sealant per manufacturer's recommendations.
38 | Drainage Plane | CONSTRUCTION STANDARDS CHECKLISTS
Made with FlippingBook Learn more on our blog