CULTURED STONE
WALL CLADDING A. Metal lath shall be installed horizontally to wood framing members, lapped 1" minimum at the sides and ends. Adjoining metal lath shall be staggered. B. Metal lath is attached to framing members with fasteners not more than 6" apart and ensuring a minimum of 3/4" embedment into the framing members. C. Mortar base coat is 3/8" to 1/2" with uniform thickness extending to the top of the stone section. Create horizontal grooving of the surface for mechanical adhesion of the stone. D. Stone has been buttered with 1/2" layer of mortar and installed to manufacturer specifcations. E. Weep screed is not clogged and are free of mortar and properly integrated into the drainage plane. F. Horizontal transitions are properly implemented
with L-flashing lapped underneath a layer of housewrap or is taped to the housewrap with flashing tape.
G. Weep screed extends 1" below the foundation plate and is a minimum of 4" above earth, 2" above paved surfaces, or 1/2" above exterior walking surfaces which are supported by the same foundation that supports the exterior wall. H. When stone extends below the screed, an expansion joint is installed at frame-to-foundation transition with flashing tape bridging the frame-to-foundation transition when the stone extends below the weep screed. I. All cultured stone terminations at dissimilar materials (siding, trim, etc.) have a minimum nominal 1/8" space with a casing bead that is sealed with C920 Class 25 sealant. J. Weep screed installed at stone-over-roof plane conditions and is held up 2" above roofng materials.
64 | Wall Cladding | CONSTRUCTION STANDARDS CHECKLISTS
Made with FlippingBook Learn more on our blog